images (70)
images (70)
+

She was by then a bit on the little side, the bronze plaque that Michael Vangerow offered over to Mayor Stefan Raetz by the German Foundation for Monument Protection at the foot of the Tomburg.  rainerland

 Later on, it will exhort visitors and climbers that the wide update of the including mass of the Tomburgruine should be possible over a period of three years in a careful campaign and appreciation to various supporters. 

Since 2015, the redesign of Tomburg in the town anteroom has been a subject that has been given high need. rainerland

 At the beginning of the 70s, at the castle complex, fissured joints were as of late filled and wide overhauls were finished. Regardless, it worked out that the workmanship of the estate complex was eventually in imperfect condition and that a further redesign was basically expected to ensure the significant structures. Despite nonattendance of connection of the mortar and the ensuing loss of individual stones and planar partition of divider portions moreover plant improvement and invading water hurt the workmanship. 

The association went on a sponsorship search and besides had accomplishment. rainerland In September 2017, it was possible to start the expansive work to update the including mass of the house ruin, after the Foundation for German Historical Monuments (it is bolstered by blessings from the West German lottery association and endowments) 90,000 euros, the Landscape Association 35,000 euros and the Tomburg-Ritter Wormersdorf 2,000 euros had ensured. The city of Rheinbach contributed guarantee resources signifying 111,000 euros. 

City lobby pioneer Stefan Raetz offered thanks toward them only for giving over the bronze plaque for their assistance; rainerland

This was gone to by Michael Vangerow and Rainer Land of the Upper Monument Authority of the Rhein-Sieg territory, Andreas Herrmann as head of the companion arrange "Tomburg", Anja Schmitz of the lottery and Andrea Barth as official of the Tomburg knights and city corridor pioneer Klaus Beer. 

Moreover, the city hallway director in like manner imparted the desire that visitors and climbers later on with this "basic achievement" of the city handle fairly more circumspectly than was consistently the circumstance beforehand. 

The underlying section of the update manage the remainders of the Tomburg in Wormersdorf has been done. The association of the city of Rheinbach has been working since 2015 with the redesign of the château. It's been ideal around quite a while since the prop up work on the ruin was done. rainerland Around at that point, the washed-out joints were restored as a component of the work on the block work. In the mean time, nevertheless, this new settlement had washed itself out, and the entire royal residence complex was in an essential condition. This was upheld by the areal loss of squares in the stone work and the plant improvement on the ruin, which water could penetrate. 

It was key to remodel the important structure to spare it. In order to confirm the financing of the assignment, various gifts were referenced by the association. rainerland Well ordered, the pledges began from the Foundation for German Preservation, which participated with 90 000 euros in the endeavor.